Budgens Bow, London
The store opened just after its construction in 1999 and was therefore in need of a substantial face lift by 2009. During Secker’s initial consultation meeting, the owner also expressed concerns at his ever increasing electrical bills that he had to pay to keep his store warm during the autumn and winter months. As a result, Secker’s were contracted to completely refit the store & 18 months later installed our cutting edge heat reclaim system.